10 Marla Grey Structure Cost in Multan 2026
Building the grey structure of a 10 Marla house (double storey, 3,376 sq ft covered) in Multan costs about Rs 99.26 Lakh — Rs 2,940 per sq ft — at standard quality on today's rates.
Cost by quality
Economy
Rs 89.24 Lakh
Rs 2,643 per sq ft
Labour contract: Rs 81.13 Lakh
Standard
Rs 99.26 Lakh
Rs 2,940 per sq ft
Labour contract: Rs 90.24 Lakh
Premium
Rs 1.1 Crore
Rs 3,263 per sq ft
Labour contract: Rs 1 Crore
Luxury
Rs 1.17 Crore
Rs 3,474 per sq ft
Labour contract: Rs 1.07 Crore
Want it ready to live in? 10 Marla complete house in Multan: Rs 2.1 Crore
Make it your own
House construction cost in Multan
Double storey, standard quality, on today's rates. Tap a size for its full breakdown.
- 3 Marla1,216 ft²Grey Rs 35.75 LakhRs 2,940/ft²Complete Rs 78.53 LakhRs 6,458/ft²
- 4 Marla1,620 ft²Grey Rs 47.62 LakhRs 2,940/ft²Complete Rs 1.02 CroreRs 6,284/ft²
- 5 Marla2,026 ft²Grey Rs 59.57 LakhRs 2,940/ft²Complete Rs 1.31 CroreRs 6,446/ft²
- 6 Marla2,296 ft²Grey Rs 67.5 LakhRs 2,940/ft²Complete Rs 1.46 CroreRs 6,365/ft²
- 7 Marla2,678 ft²Grey Rs 78.73 LakhRs 2,940/ft²Complete Rs 1.68 CroreRs 6,279/ft²
- 8 Marla3,060 ft²Grey Rs 89.96 LakhRs 2,940/ft²Complete Rs 1.92 CroreRs 6,265/ft²
- 10 Marla3,376 ft²Grey Rs 99.26 LakhRs 2,940/ft²Complete Rs 2.1 CroreRs 6,218/ft²
- 1 Kanal6,300 ft²Grey Rs 1.85 CroreRs 2,940/ft²Complete Rs 3.83 CroreRs 6,079/ft²
- 2 Kanal11,160 ft²Grey Rs 3.28 CroreRs 2,940/ft²Complete Rs 6.63 CroreRs 5,941/ft²
10 Marla grey structure cost in other cities
Questions people ask
What is the cost of building the grey structure of a 10 Marla house in Multan?
About Rs 99.26 Lakh for a double-storey house of 3,376 sq ft, at standard quality on a full contract and today's rates. Economy quality comes to about Rs 89.24 Lakh and premium about Rs 1.1 Crore.
What is the grey structure rate per square foot in Multan?
About Rs 2,940 per sq ft of covered area at standard quality — Rs 2,643 for economy and Rs 3,474 for luxury.
What is included in the grey structure?
Digging and foundation, columns, beams and roof slabs, brick walls, plaster, waterproofing and termite proofing, and the water, sewerage, gas and electrical pipes inside the walls — with the labour for all of it.
How much material is needed?
Roughly 912 bags of cement, 5.4 tons of steel, 91 thousand bricks, 5,402 cft of sand and 2,532 cft of crush.